-
Spalding Hardware Limited
Distance: 1.4 Mi1616 10 Ave SW
T3C 0J5 Calgary -
Fahrenheit 451 Fire & Security
Distance: 7.6 Mi#131-11198 42 St SE
T2C0J9 Calgary
Website Links
Description
In January 2007, Access Pipeline (ACCESS) announced the new pipeline system will begin operations, initially transporting diluents to the Christina Lake area in northeastern Alberta and subsequently delivering blended heavy oil (diluent plus bitumen) into the Edmonton area. The Access Pipeline consists of two distinct pipeline systems. The first pipeline is a 295 kilometer NPS (Nominal Pipeline Size) 16? diluent pipeline originating at Access? Sturgeon Terminal near Redwater (SW18-56-21 W4M) delivering diluent to the two projects located at the northern end of the pipeline. The second pipeline system consists of both a 295 kilometer NPS 24? and a 50 kilometer NPS 30? blended bitumen (?Blend?) pipeline. The Blend system originates at the north end of the Access? System and terminates in Edmonton where it is delivered through existing pipeline systems to downstream markets.